Airports

Airports

John Wayne Airport Terminals A and B Improvements Project

Butier Engineering, Inc. is providing project management services for the Terminals A and B Improvements Project, JWA’s three-year plan to modernize the Thomas F. Riley Terminal Complex. The Butier Team works closely with JWA operations and security on landside and airside construction activities and is responsible for the following scope of work: consultant, agency, airline, tenant…

John Wayne Airport—Construction of New Concessions Terminals A, B & C

Butier’s project managers and field representatives managed and coordinated the construction of the new concessions within Terminal A, B, and C. A total of 31 concessions were constructed with independent contractors and schedules. At times, a total of 18 different concession build-out projects were constructed concurrently. Construction typically involved high-end tenant improvement quality finishes. Inspections…

John Wayne Airport Expansion—Construction of Terminal C

Butier Engineering, Inc. joined Arcadis’ team to provide quality assurance/quality control services for the Terminal Building Expansion project at John Wayne Airport. Construction of Terminal C included the following: A new terminal building providing six (6) additional bridged B757-200 type aircraft gates adjacent to the existing South Terminal (Terminal B). The new terminal is a…

Construction of JWA’s New Maintenance Building

Butier Engineering, Inc. provided construction management and inspection services for construction of the new 24,882 square foot JWA maintenance building. The scope of work also included construction of corresponding support structures, site improvements, and interior amenities. The facility includes approximately 14,960 square feet of shop and maintenance space in the Airport Operations Area (AOA) and…

John Wayne Airport—Renovation and Upgrade of Terminals A & B for Interjet Airline Ticketing and Offices

Butier Engineering, Inc. provided construction oversight and management services for this project, which consisted of a complete renovation and upgrade of an existing unassigned space, to service John Wayne Airport’s newest International carrier, Interjet of Mexico. The roughly 800 SF space was transformed into a completely upgraded and functional Airline Ticket Office and Airline Ramp…

John Wayne Airport Bob Hope USO Center

Butier Engineering, Inc. provided project management services for the construction of the Bob Hope USO Center – the county’s first since World War II. The project included the complete renovation and upgrade of an existing unassigned space located in the Airport’s Terminal B, next to the baggage claim area on the Arrivals Level. The Center…