Reservoirs

Reservoirs

Vista Verde Reservoir Replacement—Phase II

The City of Escondido selected Butier Engineering, Inc. to provide construction management and inspection services for the replacement of the Vista Verde Reservoir. The existing 750,000-gallon steel reservoir, which suffered from internal corrosion, is being replaced with two 1 million-gallon Type I pre-stressed concrete reservoirs that will be partially buried. The extra capacity for water…

Tesoro Water Facilities-Zone II and Zone B Reservoirs

Butier Engineering, Inc. is providing third-party construction management services to Santa Margarita Water District for the Zone II and Zone B Reservoirs project, which is the third phase of the Tesoro Zone II and B Water Facilities Program. The Butier Team was also selected to provide identical services for the first and second phases of…

Rawlings Reservoir Replacement Project

Butier Engineering, Inc. provided constructability review, construction management, and inspection services for the City of Tustin’s Rawlings Reservoir Replacement Project. The City’s former 4 MG hopper bottom reservoir was taken out of service due to its age and deteriorating condition. After its decommissioning, the City proceeded with the design of two 3.0 MG prestressed circular…

Nohl Canyon Water Storage Tank Project

Butier Engineering, Inc. performed as a subconsultant to Tetra Tech, providing construction management, field engineering, and inspection services for this $20-million water storage tank project. The project team was also responsible for providing geotechnical, soils testing, noise/vibration monitoring, pre-inspection, community relations, and surveying services. The scope of work included the construction of a 10-million gallon…

930 Zone Recycled Water Reservoir

Butier Engineering, Inc. was contracted to provide construction management and inspection services for the construction of a 5 MG steel recycled water reservoir. The project scope of work includes the installation of yard piping and valving; site grading including excavation, fill, and disposal; electrical and instrumentation; 2,488 lineal feet of 30-inch cement mortar lined and…