Project Overview

Butier Engineering, Inc. provided construction management and inspection services for the expansion and upgrade of the Henry N. Wochholz Wastewater Treatment Facility. The purpose of the project was to meet Yucaipa Valley Water District's capacity needs through the year 2020, as well as upgrade the level of treatment to satisfy more stringent discharge requirements. The project expanded the former 4.5-million-gallon treatment capacity to 8-million gallons. The expansion involved major modifications and demolition of many existing facilities at the wastewater treatment plant.

Scope of Work

  • Construction of the reclaimed water reservoirs (DYK prestressed concrete reservoirs)
  • Construction of a septage receiving station
  • Primary sedimentation tank
  • Secondary treatment system
  • Secondary clarification
  • Flow equalization
  • Tertiary filters (cloth-media disk-filters)
  • Disinfection (UV)
  • Solids handling facilities
  • Stormwater collection improvements
  • Operations and control building