Celebrating 50 Years of Excellence

Your Construction Management Partner.
Your Project's Trusted Advisor.

Bringing owners, contractors, and project teams together to deliver Southern California's critical infrastructure.

50+
Years' Experience
450+
Projects Managed
$2.5B+
Total Project Value
95%
Water Infrastructure
Experience

50+ years of accumulated knowledge applied to every project.

Integrity

Honesty, transparency, and accountability in every decision.

Excellence

Disciplined delivery from pre-construction through closeout.

Why Butier

Construction Management. Exclusively.

No design services. No conflicts of interest. We manage projects independently, partnering with team members through collaboration, not confrontation, to keep projects moving forward.

Owner's Trusted Advisor

We represent your interests while fostering strong partnerships with contractors to keep projects on track.

50 Years of Expertise

Since 1976, we've protected billions in public infrastructure investments across Southern California.

Water Infrastructure Specialists

With 95% of our work focused on water and wastewater, we bring deep industry expertise to every project.

No Conflicts of Interest

We don't design. We don't build. We manage. That singular focus protects you.

Our Work

Projects That Define Excellence

450+
Projects
$2.5B+
Value Managed
50
Years
8 MG Peck Reservoir Replacement
Water
1 / 8

8 MG Peck Reservoir Replacement

Client
City of Manhattan Beach, Public Works
Location
Manhattan Beach, California
Value
$33 million
Completed
2023

The City of Manhattan Beach identified the Peck Reservoir replacement as a top priority after 60 years of effective service. The existing 7.5 MG reservoir was replaced with a new 8 MG reservoir that will be viable for 75 years. The project has enhanced the City’s drinking water storage and system reliability, helped to ensure long-term dependability, balanced the use of local groundwater with the current imported supply, and brought the existing facilities and equipment up to today’s standards to help protect water supply and distribution for the residents of Manhattan Beach.Butier Engineering, Inc. provided construction management, inspection, public relations, environmental impact monitoring, and soils/materials testing services. Team members included Ninyo & Moore, ON-SITE Technical Services, Murakawa Communications, GeoVision, and Paleowest. Murakawa Communications led Butier's Construction Information Team, providing collateral material in cooperation with the City’s project manager and contractor. Materials and events included project fact sheets, construction notices, copy for the City's project website, meeting flyers, neighborhood pop-up meetings, groundbreaking / milestone events, City Council presentations, construction information hotline, and E-newsletters.Scope of WorkReservoir—8 MG partially-buried cast-in-place concrete structure approximately 270 feet long by 190 feet wide.Operations Building—925 SF for office space and a water quality laboratory.Pump Station and Electrical Control Building—1,950 SF cast-in place concrete structure.Water Treatment Facilities—3,000 SF including two (2) horizontal filtration tanks, a protected chlorine and ammonia chemical storage building, and a glass-fused bolted steel vertical back wash tank.Ancillary Facilities—diesel standby generator, transformer, yard piping, access vaults, infiltration drywells, retaining wall, access road, pavement, fencing, gates, and landscaping.Offsite Work—replacement of raw water transmission pipeline; construction of chemical dosing and containment piping; new sewer discharge pipeline connection; new utility connections; and new curb, gutter, and sidewalks.In addition, the Butier team performed real-time vibration monitoring during the installation of shoring (performed by vibrating steel beams approximately 25 feet below grade) and backfilling. This technology allowed the team to adjust shoring installation and backfilling methods on a moment's notice to mitigate vibrations reaching levels that could cause property damage in a highly-engaged and affluent residential neighborhood.

View Case Study
Our Reach

50 Years.
Across Southern California.

From Los Angeles, San Bernardino, and Riverside to Orange and San Diego counties, water districts and public agencies across the region have trusted Butier with their most critical infrastructure projects.

450+
Projects
54+
Cities
$2.5B+
Managed
Explore the Full Map

Hover any pin to see the city, or click to view the projects there — then jump straight to a project.

Butier Engineering — Built on a Foundation of Trust
Butier Engineering 50th Anniversary
Our Story

Built on a Foundation of Trust

For 50 years, Butier Engineering has served as the essential bridge between public infrastructure owners and construction contractors. We were founded on a simple principle: owners deserve a trusted advisor whose sole focus is protecting their investment.

What sets us apart is what we don't do. We don't design. We don't build. We manage—with singular focus and zero conflicts of interest. This clarity of purpose has earned us the trust of special districts, municipalities, and public agencies throughout Southern California.

Learn More About Us
Get Started

Ready to Discuss Your Project?

Let's talk about how Butier can help protect your infrastructure investment.