Carlsbad Desalination Plant Intake and Discharge Facility
Back to Projects
WaterTreatment - Desalination

Carlsbad Desalination Plant Intake and Discharge Facility

Carlsbad$182 million

Owner

Poseidon Resources (Channelside) LP

Location

Carlsbad, California

Value

$182 million

Completion

2025

Contractor

Kiewit - Shea (Joint Venture)

Designer/Engineer

HDR Engineering

Project Overview

The Claude “Bud” Lewis Carlsbad Desalination Plant Intake and Discharge Facility features an innovative system of 11 seawater screens supported by a newly constructed concrete access bridge. This cutting-edge design significantly enhances the protection of marine life by reducing intake water velocity and minimizing the size of the mesh opening. At Butier, we were honored to contribute to this essential project by providing resident engineering, QA/QC management, field QA/QC, schedule review, field engineering, and cost control services.

The upgrades ensure the plant will continue to meet California's evolving standards for protecting marine life. The desalination plant’s intakes were originally configured to draw seawater from the Encina Power Station’s once-through-cooling system. That system was phased out by the state, and the power station shut down in December 2018. Its closure led to temporary intake-discharge operations at the desalination plant until new fish-friendly dilution pumps came online in 2020. Butier's team also provided CM and inspection services for the temporary operations.

Scope of Work

  • New dual-flow screen system and ancillary systems supported on a new concrete access bridge, including piles, pile bents, and access ramps
  • A dual-flow spray wash system, which includes pumps, piping, and nozzles
  • Screen debris removal/management system
  • Floating debris boom system
  • Large organism exclusion system
  • New electrical building to house motor controls, variable speed drives, and other controls
  • Instrumentation and controls required for the permanent modifications
  • Connecting piping between the existing intake tunnel and the existing intake pump station
  • Abandonment of the generation station intake and discharge tunnel portions no longer needed to support operations