Project Overview
Butier Engineering, Inc. provided construction management and inspection services for the construction of the Trampas Canyon Dam and Reservoir. The dam and reservoir were reconstructed on 177 acres of property to create a 1.6 billion gallon recycled water reservoir. Construction consisted of new inlet/outlet structures, a spillway, micro-tunneling, instrumentation, and a new Dam control building. The project helps SMWD achieve its goal of recycling 100% of its wastewater and provide seasonal and operational storage for its existing and proposed recycled water system. The reservoir supplies irrigation demands for customers in Talega Valley and in Rancho Mission Viejo’s (RMV) ongoing Ranch Plan development, as well as other existing irrigation demands in South Orange County. Recycled water is supplied by the Chiquita Water Reclamation Plant (CWRP) and may be supplemented with other non-domestic water (NDW) supply sources.
By the Numbers:
- Largest recycled water reservoir in Orange County
- 1.6 billion-gallon recycled water reservoir = 2,500 Olympic-size swimming pools
- $109 million (total project cost)
- $93 million (construction cost)
- 3,000 feet long from the east dam to the west side of the reservoir
- 2,700 feet from back of reservoir to the dam
- Deepest Point: 80 feet
- Face of Dam: 216 feet high
- Surface Area: 177 acres
- Dam was built 40 feet higher than it previously was
- 4.3 million cubic yards of grading and excavation
- 41 million gallons of rainwater removed by construction teams due to 2018 storms