Chino I Desalter VOC Treatment Facilities
Owner
Chino Basin Desalter Authority
Location
Chino, California
Value
$12 million
Completion
2023
Contractor
Pacific Hydrotech Corporation
Designer/Engineer
Hazen and Sawyer
Project Overview
Butier Engineering, Inc. provided construction management and inspection services for the Chino I Desalter VOC Treatment Facilities Project. In a joint effort with the County, CDA constructed two new treatment facilities at the Chino I Desalter to remove volatile organic compounds (VOCs) from seven CDA wells and new County wells, respectively. The two systems have a combined capacity of 3,550 gpm with provisions for expanding an additional 800 gpm.
Scope of Work
- New Granular Activated Carbon Systems (GAC)
- Cartridge and bag filtration systems
- Sulfuric acid storage and feed systems
- Piping systems and tie-ins
- Demolition of various structures and site improvements
- Storage building
- Electrical, instrumentation and controls
- Off-site pipeline to convey raw water from the County’s wells for treatment at the Chino I Desalter
- System performance testing and startup activities