Nohl Canyon Water Storage Tank Project
Back to Projects
WaterReservoirs & Dams

Nohl Canyon Water Storage Tank Project

Anaheim$20 million

Owner

City of Anaheim

Location

Anaheim

Value

$20 million

Completion

2010

Contractor

Gateway Pacific Contractors

Project Overview

Butier Engineering, Inc. performed as a subconsultant to Tetra Tech, providing construction management, field engineering, and inspection services for this $20-million water storage tank project. The project team was also responsible for providing geotechnical, soils testing, noise/vibration monitoring, pre-inspection, community relations, and surveying services. The scope of work included the construction of a 10-million gallon buried pre-stressed concrete circular tank to replace the existing Olive Hills Reservoir. The construction included 500,000 cubic yards of grading; 1,700 cubic yards of concrete in slab; 1,900 cubic yards of concrete wall; 14.5 miles of post-tensioned cable in floor; and 128 miles of post-tensioned cable in and wrapped around wall.

The decision to construct a 10 MG reservoir versus a 20 MG reservoir drastically reduced the construction impacts to the surrounding community, which included multi-million dollar family residences and an elementary school. The design allowed for regrading the existing slopes to a flatter grade (2:1). Other improvements included the installation of additional piezometers and inclinometers, appurtenant pipeline and pump station improvements, and landscaping.

Explore More Projects

View our complete portfolio of water infrastructure projects across Southern California.