Project Overview

Butier Engineering, Inc. provided comprehensive construction management and field quality assurance services throughout pre-construction and project closeout phases. In addition, the original location for the electrical building was changed due to underground utility conflicts. Several modifications were necessary to accommodate the routing and installation of new electrical service from SCE. Butier’s electrical engineer examined the electrical installation and assisted SOCWA staff with submitting a letter to SCE requesting energization.

Scope of Work

  • Construction of a new masonry building to house the new switchgear
  • Removal of one of the existing 400 kW engine generator units
  • Removal of power and control wiring from the remaining two 400 kW engine generator sets
  • Installation of a new 800 kW engine generator system, new boiler system, and new co-generation control system
  • Replacement of plant switchgear
  • Relocation of temporary hot water pipeline
  • Replacement of the coating systems within Digester No. 2