Owner
Trabuco Canyon Water District
Location
Lake Forest, California
Value
$2.2 million
Completion
2020
Contractor
Pacific Hydrotech
Designer/Engineer
Hazen and Sawyer
Project Overview
Butier Engineering, Inc. provided construction management, inspection, specialty inspection, and materials testing (GMU Geotechnical) services for the Ridgeline Booster Pump Station Project.
Scope of Work
- Installation of three (3) 2 CFS turbine pumps
- Upgrade of one 2 CFS pump with a VFD and replacement of associated discharge piping and valving
- Removal of portions of the existing floor slabs, interior walls, and interior and perimeter wall footings
- Trenching below the existing walls and footings of the booster pump station
- Demolition of an existing concrete pad and its surrounding CMU walls
- Installation of new underground suction piping
- Construction of an electrical control room and electrical upgrades to include an on-site generator with an automatic transfer switch
- Construction of a new generator equipment pad
- Improvements to the existing underground flow meter vault
- Replacement and extension of the existing asphalt pavement
- Installation of a new ornamental steel truck gate and ornamental steel fencing