San Jacinto Groundwater Treatment Facility
Back to Projects

San Jacinto Groundwater Treatment Facility

San Jacinto$25.3 million

Owner

Eastern Municipal Water District

Location

San Jacinto, CA

Value

$25.3 million

Completion

2026

Contractor

Pacific Hydrotech Corporation

Designer/Engineer

Tetra Tech

Project Overview

Butier Engineering, Inc. is providing construction management and staff augmentation services for the San Jacinto Groundwater Treatment Facility, a new centralized facility located at Hewitt and Evans Streets. The project is a major component of EMWD's Groundwater Reliability Plus initiative and is designed to treat groundwater produced from four new production wells, as well as water originating from EMWD's Water Banking and PWR programs before entering the potable distribution system. The facility will treat over 11,000 acre feet annually, supplying safe drinking water for more than 25,000 households.

Key Project Elements

  • Site grading improvements
  • Chemical building with electrical/control rooms
  • Green sand filtration treatment systems
  • Mechanical equipment installation
  • Backwash pump station and recycle tank
  • Electrical, instrumentation, and SCADA systems
  • Perimeter block wall and drought tolerant landscaping