Have a Similar Project?
Let's discuss how our construction management expertise can help ensure your project's success.
Schedule Consultation(714) 832-7222Project Overview
Butier Engineering, Inc. is providing construction management and staff augmentation services for the San Jacinto Groundwater Treatment Facility, a new centralized facility located at Hewitt and Evans Streets. The project is a major component of EMWD's Groundwater Reliability Plus initiative and is designed to treat groundwater produced from four new production wells, as well as water originating from EMWD's Water Banking and PWR programs before entering the potable distribution system. The facility will treat over 11,000 acre feet annually, supplying safe drinking water for more than 25,000 households.
Key Project Elements
- Site grading improvements
- Chemical building with electrical/control rooms
- Green sand filtration treatment systems
- Mechanical equipment installation
- Backwash pump station and recycle tank
- Electrical, instrumentation, and SCADA systems
- Perimeter block wall and drought tolerant landscaping
Explore More Projects
View our complete portfolio of water infrastructure projects across Southern California.


