Yucaipa Valley Regional Water Filtration Facility
Back to Projects
WaterTreatment - Membranes

Yucaipa Valley Regional Water Filtration Facility

Yucaipa$29 million

Owner

Yucaipa Valley Water District

Location

Yucaipa, California

Value

$29 million

Completion

2007

Contractor

W.M. Lyles Co.

Designer/Engineer

HDR

Project Overview

Butier Engineering, Inc. provided construction management and inspection services for the construction of the Yucaipa Valley Regional Water Filtration Facility (YVRWFF). The YVRWFF was constructed on the same site concurrently with the 6.0 MG R13.1 Finished Water Storage Tank.

Scope of Work

  • Automatic strainers and free surface flow distribution structure
  • Manual strainers
  • 12 MGD microfiltration membrane system
  • 6 MGD nanofiltration membrane system
  • Blending structure
  • Operations building, including membrane room and pre-engineered steel frame system, basement, and operations and administrative rooms
  • Chemical building, chemical storage, and feed systems
  • Dissolved air flotation backwash water treatment system
  • Backwash equalization pump and DAF feed pump station
  • DAF effluent sump and pump station
  • CIP waste sump and pump station
  • Sanitary waste pump station
  • Site work and landscaping
  • Electrical and instrumentation
  • Site utilities and drainage systems