Sodium Hypochlorite Storage Tank Replacement
Butier Engineering, Inc. provided construction management and inspection services for the replacement of the existing sodium hypochlorite (SHC) storage tanks. The four tanks, which are located at the Edward C. Little Water Recycling Facility (ECLWRF), are approximately 29,000 gallons each, 12-foot in diameter, 30-feet tall, and made of fiberglass reinforced plastic (FRP) materials. The existing…
West Basin Microfiltration Equalization Tank
Butier Engineering, Inc.’s scope of work for the construction of the Microfiltration Equalization Tank included construction management and inspection services. The project was awarded as Task Order No. 1 under the West Basin Municipal Water District’s As-Needed Construction Management Services Contract for Water Facility Capital Improvement Projects. The project consisted of the installation of a…