Pipelines

Pipelines

Chino Creek Well Field Raw Water Pipeline

Butier Engineering, Inc. provided construction management and inspection services for the Chino Creek Well Field Raw Water Pipeline project. The pipeline was installed as part of the CDA Phase III Expansion Project. Approximately 8,500 LF of PVC pipe ranging from 8” to 16” in diameter was installed within the City of Chino right of way…

Broadway Trunk Sewer Replacement/Rehabilitation Phase I-Microtunneling

Butier Engineering, Inc. provided resident engineering and inspection services during microtunneling operations for installation of approximately 6,132 linear feet of 36-inch vitrified clay pipe in East Broadway Avenue in the City of Long Beach. The project also included construction of eleven (11) standard 72-inch manholes, two (2) conflict reinforced concrete box structures, connection to the…

Pipeline 4 Relining SR 52 to Lake Murray

Butier Engineering, Inc. provided construction management, contract administration, and inspection services for the Pipeline 4 Relining SR 52 to Lake Murray project. The project site was located in two separate areas. The Pipeline 4 Relining and PCCP Replacement site began on the north side of State Route 52 and proceeded through Missions Trails Park to…

Pipeline 3 Desalination Relining—San Marcos to Twin Oaks

Butier Engineering, Inc. is providing construction management, contract administration, and inspection services for the Pipeline 3 Desalination Relining San Marcos to Twin Oaks project. SDCWA is relining five miles of Pipeline 3 through the unincorporated community of Twin Oaks Valley into the northern part of the City of San Marcos. Pipeline 3 is being relined…

Perris Valley Pipeline

Butier Engineering, Inc. provided construction management and inspection services for this $80 million pipeline project, which provides water reliability and quality benefits to western Riverside County. It was a joint effort between Metropolitan Water District of Southern California (lead agency), Western Municipal Water District, and Eastern Municipal Water District. The Perris Valley Pipeline has enhanced…

San Diego Pipeline No. 6—Northern Reach

Butier Engineering, Inc. provided construction management and inspection services for approximately 7 miles of major pipeline construction in Temecula. The San Diego Pipeline No. 6 project consisted of constructing approximately 160 LF of 144-inch diameter fabricated steel pipeline and 35,283 LF of 120-inch diameter fabricated steel pipeline, in-plant fabrication inspection, field welding inspection, constructing facility…

Chino Desalter Phase 3 Product Water Pipeline

Butier Engineering, Inc. is providing construction management and inspection services for the Chino Desalter Phase 3 Product Water Pipeline project. The Chino Basin Desalter Authority (CDA) is constructing a 30-inch diameter pipeline to deliver drinking water to the cities of Eastvale, Ontario, and Norco. The project begins at Mississippi Drive and continues northbound along Hamner…