OCWD Fletcher Basin Dedication Ceremony
Butier Engineering, Inc. (Butier) attended Orange County Water District’s and Orange County Flood Control District’s dedication ceremony for Fletcher Basin on October 27, 2016. Butier’s team was recognized for their construction management, field inspection and materials testing (Ninyo & Moore) efforts for the $5.6 million project. The Basin, which was designed by Black & Veatch and constructed by Sukut Construction, Inc., will provide stronger flood control for the region and recharge more than 400 acre-feet of water into the Orange County Groundwater Basin annually. This increase in local groundwater will result in a significant cost savings to the region.