Water Projects

Chandler Avenue Well No. 12, Croddy Way Well No. 14, and Pipeline Project

Owner:
Mesa Water District
Location:
Santa Ana, California
Value:
$18.2 million
Completion:
2023
Contractor:
Ferreira Construction

Butier Engineering, Inc. provided constructability review, project coordination, resident engineering, and construction inspection services for the drilling and construction of two 3000 to 4000 GMP municipal water supply wells that will produce groundwater from selected water-bearing zones. The project consisted of the demolition and removal of existing structures at both locations, construction of temporary storm drains, 24-hour drilling to at least 1,060 feet, and construction, testing and disinfection. The scope of work also included the construction of the Chandler Avenue and Croddy Way Pipeline connecting the two new wells to the existing local water system. Construction consisted of 2,289-LF of 30-inch pipe; 2,160-LF of 16-inch pipe; 527-LF 18-inch storm drain; air release and vacuum valve assemblies; and blow-off assemblies.