Water Projects

Chino Desalter Phase 3 Expansion Milliken 1010 Zone Pump Station

Location:
Ontario, CA
Value:
$1,266,742
Completion:
June 2014
Owner:
Chino Basin Desalter Authority
Engineer:
Tetra Tech
Contractor:
Cora Constructors, Inc.

Butier Engineering, Inc. provided construction management and inspection services for the construction of the Milliken 1010 Zone Pump Station, which is a part of the Chino Desalter Phase 3 Expansion. The summary of work includes, but is not limited to, construction of the following potable water improvements:

  • Ventilated CMU Pump Station
  • 198 lineal feet of 16-inch discharge piping and interconnection to an existing 30-inch transmission line
  • 24-inch suction piping and interconnection to an existing 24-inch transmission line
  • Installation of 3 vertical turbine pumps and associated piping, fittings, valves, appurtenances, electrical instrumentation, and controls
  • Site improvements, including site grading; 3,500 SF of AC paving and base material; tree relocation; and PCC pavement, curb, and gutter restoration in accordance with Caltrans requirements