Chino Desalter Phase 3 Expansion Milliken 1010 Zone Pump Station
- Location:
- Ontario, CA
- Value:
- $1,266,742
- Completion:
- June 2014
- Owner:
- Chino Basin Desalter Authority
- Engineer:
- Tetra Tech
- Contractor:
- Cora Constructors, Inc.
Butier Engineering, Inc. provided construction management and inspection services for the construction of the Milliken 1010 Zone Pump Station, which is a part of the Chino Desalter Phase 3 Expansion. The summary of work includes, but is not limited to, construction of the following potable water improvements:
- Ventilated CMU Pump Station
- 198 lineal feet of 16-inch discharge piping and interconnection to an existing 30-inch transmission line
- 24-inch suction piping and interconnection to an existing 24-inch transmission line
- Installation of 3 vertical turbine pumps and associated piping, fittings, valves, appurtenances, electrical instrumentation, and controls
- Site improvements, including site grading; 3,500 SF of AC paving and base material; tree relocation; and PCC pavement, curb, and gutter restoration in accordance with Caltrans requirements