Moffett Drive Bridge Construction and Street Improvements

Owner:
City of Tustin
Location:
Tustin, CA
Value:
$5.75 million
Completion:
2018
Engineer:
Michael Baker International

Butier is providing project management, construction management and inspection services for the Moffett Drive Bridge Construction and Street Improvements Project. The bridge work consists of constructing a single span cast-in-place concrete box girder bridge approximately 108 feet in length and 73.25 feet in width. The work also includes an architectural steel arch on each side of the bridge.

In addition to the bridge construction, the scope of work includes the following: grading, roadway construction, street improvements, landscape improvements, utility construction, domestic and recycled water, dry utilities, aesthetic treatments, construction of barriers, sidewalks, wing-walls, foundation, railings, structure excavation, backfill, drainage, and bridge lighting.

Butier staff is coordinating with several stakeholders, including the Department of the Navy, U.S. Army Corps of Engineers, Caltrans, the City of Irvine, Irvine Ranch Water District, Orange County Flood Control District, Southern California Gas Co., and Southern California Edison.