OCWD Awards Five Coves Contract to Butier
Orange County Water District selected Butier Engineering to provide construction management and inspection services for the Upper and Lower Five Coves Rehabilitation Project. The existing Five Coves facility is in need of major rehabilitation in order to continue to provide diversion of flows. The scope of work includes construction of a new flow measurement structure at the end of the Off River system, construction of a new surface transfer structure and drain tube between Upper Five Coves and Lower Five Coves, rehabilitation of the gates between the Santa Ana River and Upper Five Coves Basin, and the replacement and construction of a new gate and concrete inlet between Lower Five Coves and Lincoln Basin.