Airports
John Wayne Airport – Terminal Building Curtain Wall Modifications
Butier Engineering, Inc. managed and coordinated the construction of the Terminal Building Curtain Wall Modifications project which includes the construction of two new curtain wall bays to house future casual bar and dining concession amenities. The objective was to develop usable floor space through the addition of two 30 ft. wide by 15 ft. deep…
John Wayne Airport – Paularino Gate Improvements Project
Butier Engineering, Inc. managed and coordinated the construction of the Paularino Gate, which provided safety and security improvements to the airport perimeter and airfield access gate. The scope of work included the following: replacement of the current airfield gate with a crash-resistant gate; replacement of the guard booth and installation of an additional guard booth…
John Wayne Airport Terminals A & B Air Handlers Replacement Project
Butier Engineering, Inc. managed and coordinated the removal and replacement of nine (9) air handling units located on the rooftops of Terminals A and B. The project included new energy-efficient units that provide reliable, optimum climate control for tenants and travelers. The scope of work included modifying ductwork and the installation of new pipe and…
John Wayne Airport – SNAFUEL Expanded Fuel Storage Facilities and Pipeline
SNAFUEL, Inc. is a non-profit consortium of commercial airlines and cargo operators at JWA that provides fueling services for the consortium. JWA authorized SNAFUEL to construct, maintain, and operate a new above-ground jet fuel storage tank farm (Expanded Fueling Facilities) comprised of two new tanks, each with a net operating capacity of 1.5 million gallons…
John Wayne Airport – Airport Operations Center (Station 18) Improvements
Butier Engineering, Inc. managed and coordinated the retrofitting of the existing Airport Police Services Dispatch Center, which was developed into a new situation room in Terminal A. The Project includes office space layout redesign and improvements for adjacent offices to the current Sherriff dispatch area, including improvements to the network server room, other offices used…
John Wayne Airport Terminals A and B Improvements
Butier Engineering, Inc. provided project management services for the Terminals A and B Improvements Project, JWA’s three-year plan to modernize the Thomas F. Riley Terminal Complex. The Butier Team worked closely with JWA operations and security on landside and airside construction activities and was responsible for the following scope of work: consultant, agency, airline, tenant…
John Wayne Airport Expansion – Terminal C
Butier Engineering, Inc. joined Arcadis’ team to provide quality assurance/quality control services for the Terminal Building Expansion project at John Wayne Airport. Construction of Terminal C included the following: A new terminal building providing six (6) additional bridged B757-200 type aircraft gates adjacent to the existing South Terminal (Terminal B). The new terminal is a…
John Wayne Airport — Terminals A, B & C Concessions
Butier’s project managers and field representatives managed and coordinated the construction of the new concessions within Terminal A, B, and C. A total of 31 concessions were constructed with independent contractors and schedules. At times, a total of 18 different concession build-out projects were constructed concurrently. Construction typically involved high-end tenant improvement quality finishes. Inspections…
John Wayne Airport – New Maintenance Building
Butier Engineering, Inc. provided construction management and inspection services for construction of the new 24,882 square foot JWA maintenance building. The scope of work also included construction of corresponding support structures, site improvements, and interior amenities. The facility includes approximately 14,960 square feet of shop and maintenance space in the Airport Operations Area (AOA) and…
John Wayne Airport Bob Hope USO Center
Butier Engineering, Inc. provided project management services for the construction of the Bob Hope USO Center – the county’s first since World War II. The project included the complete renovation and upgrade of an existing unassigned space located in the Airport’s Terminal B, next to the baggage claim area on the Arrivals Level. The Center…
John Wayne Airport—Renovation and Upgrade of Terminals A & B for Interjet Airline Ticketing and Offices
Butier Engineering, Inc. provided construction oversight and management services for this project, which consisted of a complete renovation and upgrade of an existing unassigned space, to service John Wayne Airport’s newest International carrier, Interjet of Mexico. The roughly 800 SF space was transformed into a completely upgraded and functional Airline Ticket Office and Airline Ramp…