Treatment

Treatment

Chiquita Water Reclamation Aeration Basins No. 3 and 4

Butier Engineering, Inc. provided construction management services for the construction of the Chiquita Water Reclamation Plant (CWRP) Aeration Basins No. 3 and 4. The plant is one of the District’s facilities for treating domestic and industrial wastewater prior to discharging to the Pacific Ocean or for additional treatment to produce recycled water. The scope of…

J.B. Latham Treatment Plant Facility Improvements

South Orange County Wastewater Authority selected Butier Engineering, Inc. to provide construction management services for the J.B. Latham Treatment Plant Facility Improvements Packages A and C Project. The Plant has a total treatment capacity of approximately 13 million gallons. It treats approximately 6.7 million gallons of wastewater per day in compliance with federal and state…

Regional Treatment Plant Cogeneration & Switchgear Upgrades

Upgrades to the Regional Treatment Plant included the following: construction of a new masonry building to house the new switchgear; removal of one of the existing 400 kW engine generator units; removal of power and control wiring from the remaining two 400 kW engine generator sets; installation of a new 800 kW engine generator system,…

Treatment Facilities Expansion Program Plant 2

This $71 million project is an excellent example of Butier Engineering, Inc.’s proven ability to manage high-dollar, high-visibility, and long-term projects, as well as the ability to manage construction activities with minimal disruption to ongoing plant operations, residences, and high-traffic areas. The projects, comprising the Wastewater Treatment Facility Expansion Program at Plant No. 2, were…

Henry N. Wochholz Wastewater Treatment Facility Expansion

Butier Engineering, Inc. provided construction management and inspection services for the expansion and upgrade of the Henry N. Wochholz Wastewater Treatment Facility. The purpose of the project was to meet Yucaipa Valley Water District’s capacity needs through year 2020, as well as upgrade the level of treatment to satisfy more stringent discharge requirements. The project…

Los Alisos Water Reclamation Plant Upgrades

Butier Engineering, Inc. provided construction management and inspection services for the Los Alisos Water Reclamation Plant Upgrades. The upgrade increased the capacity of the Plant’s ability to process more influent from the surrounding cities and provide them with a high quality of treated water for agricultural use. The following equipment and systems were included as…