Butier Awarded CM Services Contract for City of Fountain Valley’s Reservoir & Pump Station Project

The City of Fountain Valley selected Butier Engineering, Inc. to provide construction management and inspection services for the Reservoir No. 2 and Pump Station Rehabilitation and Walnut Storm Drain Pump Station Upgrades Project. Construction will include both the pump stations and mechanical equipment, and improvements to the buildings, reservoir, sumps, hardscape, and landscape. Reservoir No. 2 is located in Cordata Park on Tanager Street in the City of Fountain Valley. Walnut Pump Station is located in the southwest portion of the City at the intersection of Cockatoo Avenue and Walnut Street. The pump station is located directly across the Talbert Flood Control Channel from Reservoir No. 2 with a bridge linking the tract to Cordata Park. Storm water is conveyed to the facility via a 60-inch and a 54-inch storm drain and is discharged into the Talbert Flood Control Channel directly adjacent to the station. Butier’s team includes Ninyo & Moore (Geotechnical & Materials Testing) and ON-SITE Technical Services, Inc. (Fabrication Inspection and Start-Up Support).