Transportation

Victory Road Extension Roadway Construction Project

Owner:
City of Tustin, Department of Public Works
Location:
Tustin, California
Value:
$4.6 million
Completion:
2017
Photo Credit:
Mol Goodman Photography

Butier Engineering, Inc. was selected to provide construction management and inspection services for the Victory Road improvements, extending from the existing “Tee” intersection of Red Hill Avenue and Victory Road southeast to Armstrong Avenue.

The project includes the development and construction of street improvements, roadway paving, and installation of storm drain, sewer, water and dry utilities for Victory Road. The scope of work consists of materials removal and recompaction, excavation, stabilization, and placement of fill within the project site; finishing of undercuts of streets and parkway grading; erosion and sediment control; installation of basins, storm drain, and drainage structures; construction of channels and swales; protection-in-place and/or demolition of IRWD facilities; pavement striping, signing and delineation; traffic signal installation and interconnect; and construction of water, reclaimed water and sanitary sewer facilities.

The project requires coordination with numerous stakeholders, including the County of Orange, Irvine Ranch Water District, Department of the Navy, Caltrans, Army Corps of Engineers, California Regional Water Quality Control Board, Orange County Sanitation District, South Coast Air Quality Management District, State of California Department of Fish and Game, State of California Department of Toxic and Substance Control, and Southern California Edison.