ID1 Capacity, Reliability & Augmentation Sewer Replacement
Butier Engineering, Inc. performed construction management, inspection, document control, and multiple stakeholder coordination for the Capacity, Reliability, and Augmentation Sewer Replacement Project. The system dates back to 1962, and the aging sewer lines were in need of repairs/replacements to ensure toilets, showers, and sink drains remain operational. Select sewer lines were upsized with new sewer…
Agua Hedionda Sewer Lift Station and Vista/Carlsbad Interceptor Sewer Replacement
Butier Engineering, Inc. performed as the Owner’s Representative for the construction of the sewer lift station and interceptor sewer reaches. This was a joint sewer project with the City of Vista and the City of Carlsbad to replace existing facilities, increase sewer capacity and improve reliability within the lower portion of the sewer system. The…
Vista Village Drive Trunk Sewer Improvement Project
Butier Engineering, Inc. provided construction management and QA inspection services for the construction of a new trunk sewer on West Vista Way between Vista Village Drive and Brass Lane. The project has improved reliability for one of the City’s main sewer conveyance systems; increased capacity of the main trunk sewer; and reduced risk of sanitary…
Tesoro Water Facilities—Domestic and Reclaimed Water Transmission Main and Coto de Caza Trunk Sewer Relocation
Butier Engineering, Inc. provided construction management and inspection services for the DW and RW Transmission Main and Coto de Caza Trunk Sewer Relocation (C-1767D), which was the second phase of the Zone II and B Water Facilities project. The project is located south of Tesoro High School (off Oso Parkway) approximately 0.75 miles north of…
Lift Station 2 Force Main Rehabilitation Project
Butier Engineering, Inc. provided construction management and inspection services for the Lift Station 2 Force Main (LS-2 FM) Rehabilitation Project. Services included project controls, construction services, and project completion and closeout activities. The LS-2 FM Project consisted of the rehabilitation of the existing 6,400 foot, 20-inch diameter, polyurethane lined, polyethylene wrapped, Class 250 ductile iron…
Chino Creek Well Field Raw Water Pipeline
Butier Engineering, Inc. provided construction management and inspection services for the Chino Creek Well Field Raw Water Pipeline project. The pipeline was installed as part of the CDA Phase III Expansion Project. Approximately 8,500 LF of PVC pipe ranging from 8” to 16” in diameter was installed within the City of Chino right of way…
Broadway Trunk Sewer Replacement/Rehabilitation Phase I-Microtunneling
Butier Engineering, Inc. provided resident engineering and inspection services during microtunneling operations for installation of approximately 6,132 linear feet of 36-inch vitrified clay pipe in East Broadway Avenue in the City of Long Beach. The project also included construction of eleven (11) standard 72-inch manholes, two (2) conflict reinforced concrete box structures, connection to the…