Wells

Mid-Basin Injection (MBI) Wells – Centennial Park

Butier Engineering, Inc. provided constructability review, project coordination, resident engineering, and construction inspection services for the Mid-basin Injection Wells Project located in and around the City of Santa Ana’s 87-acre Centennial Park. The wells directly inject 6-10 million gallons of water per day from the Orange County Water District’s Groundwater Replenishment System (GWRS) into the…

Edinger Avenue Well Phase II Equipping

Butier Engineering, Inc. provided project / construction management and inspection services for the Edinger Avenue Well – Phase II Equipping Project. The project was part of the City of Tustin’s Water Services Division, which is responsible for the production and safe delivery of domestic water to more than 14,100 service connections through approximately 172 miles…

Equipping of Chino Creek Well Field Wells I-16, I-17 and I-18

Butier Engineering, Inc. provided construction management and inspection services for the Equipping of Chino Creek Well Field Wells I-16, I-17 & I-18 project. The groundwater wells were equipped as part of the CDA Phase III Expansion Project. In addition to well equipping, the project included the installation of 625 LF of 8-inch diameter HDPE corrugated…

OC Groundwater Storage Program, 8 Water Production Wells

Butier Engineering, Inc. provided construction management, contract administration, inspection, and quality control services for the eight extraction wells. The scope of work for each project location included the following: housing structures for pumps, motors, and piping; site improvements, including paving, drainage, fencing, and landscaping; installation of deep well turbine pump and motors; electrical and instrumentation;…