Wastewater
Tesoro Water Facilities—Domestic and Reclaimed Water Transmission Main and Coto de Caza Trunk Sewer Relocation
Butier Engineering, Inc. is providing construction management and inspection services for the DW and RW Transmission Main and Coto de Caza Trunk Sewer Relocation (C-1767D), which is the second phase of the Zone II and B Water Facilities project. The project is located south of Tesoro High School (off Oso Parkway) approximately 0.75 miles north…
Chino Creek Well Field Raw Water Pipeline
Butier Engineering, Inc. provided construction management and inspection services for the Chino Creek Well Field Raw Water Pipeline project. The pipeline was installed as part of the CDA Phase III Expansion Project. Approximately 8,500 LF of PVC pipe ranging from 8” to 16” in diameter was installed within the City of Chino right of way…
Broadway Trunk Sewer Replacement/Rehabilitation Phase I-Microtunneling
Butier Engineering, Inc. provided resident engineering and inspection services during microtunneling operations for installation of approximately 6,132 linear feet of 36-inch vitrified clay pipe in East Broadway Avenue in the City of Long Beach. The project also included construction of eleven (11) standard 72-inch manholes, two (2) conflict reinforced concrete box structures, connection to the…