Pipelines

Pipelines

ID1 Capacity, Reliability & Augmentation Sewer Replacement

Butier Engineering, Inc. performed construction management, inspection, document control, and multiple stakeholder coordination for the Capacity, Reliability, and Augmentation Sewer Replacement Project. The system dates back to 1962, and the aging sewer lines were in need of repairs/replacements to ensure toilets, showers, and sink drains remain operational. Select sewer lines were upsized with new sewer…

Vista Village Drive Trunk Sewer Improvement Project

Butier Engineering, Inc. provided construction management and QA inspection services for the construction of a new trunk sewer on West Vista Way between Vista Village Drive and Brass Lane. The project has improved reliability for one of the City’s main sewer conveyance systems; increased capacity of the main trunk sewer; and reduced risk of sanitary…

Lift Station 2 Force Main Rehabilitation Project

Butier Engineering, Inc. provided construction management and inspection services for the Lift Station 2 Force Main (LS-2 FM) Rehabilitation Project. Services included project controls, construction services, and project completion and closeout activities. The LS-2 FM Project consisted of the rehabilitation of the existing 6,400 foot, 20-inch diameter, polyurethane lined, polyethylene wrapped, Class 250 ductile iron…

Chino Creek Well Field Raw Water Pipeline

Butier Engineering, Inc. provided construction management and inspection services for the Chino Creek Well Field Raw Water Pipeline project. The pipeline was installed as part of the CDA Phase III Expansion Project. Approximately 8,500 LF of PVC pipe ranging from 8” to 16” in diameter was installed within the City of Chino right of way…

Broadway Trunk Sewer Replacement/Rehabilitation Phase I-Microtunneling

Butier Engineering, Inc. provided resident engineering and inspection services during microtunneling operations for installation of approximately 6,132 linear feet of 36-inch vitrified clay pipe in East Broadway Avenue in the City of Long Beach. The project also included construction of eleven (11) standard 72-inch manholes, two (2) conflict reinforced concrete box structures, connection to the…

Mission Trails Flow Regulatory Structure II and Control Facility

The San Diego County Water Authority selected Butier Engineering, Inc. to provide construction management services for the Mission Trails Flow Regulatory Structure II and Flow Control Facility Project. Ninyo & Moore is providing materials testing, soils testing, and geotechnical services as a sub-consultant to Butier. The project, which is located in the northwest area of Mission…

Foothill Feeder 78-inch Pipeline Relocation

Butier Engineering, Inc. provided construction management and inspection services for the Foothill Feeder Pipeline Relocation Project. The project area borders the west end of the San Manuel Band of Mission Indians (SMBMI) tribal property, starting at the east end of Piedmont Drive and proceeding south along the western San Manuel Casino (Casino) property line. It…

Pipeline 3 Relining Lake Murray to Sweetwater Reservoir

Butier Engineering, Inc. provided construction management services for the Pipeline 3 Relining project as a sub-consultant to Richard Brady & Associates. The 4.3 miles of relined pipeline extends from Lake Murray in the north to Sweetwater Reservoir in the south. It serves the Helix Water District and Sweetwater Authority and traverses portions of Baltimore Drive…

Pipeline 4 Relining SR 52 to Lake Murray

Butier Engineering, Inc. provided construction management, contract administration, and inspection services for the Pipeline 4 Relining SR 52 to Lake Murray project. The project site was located in two separate areas. The Pipeline 4 Relining and PCCP Replacement site began on the north side of State Route 52 and proceeded through Missions Trails Park to…

Pipeline 3 Desalination Relining—San Marcos to Twin Oaks

Butier Engineering, Inc. provided construction management, contract administration, and inspection services for the Pipeline 3 Desalination Relining San Marcos to Twin Oaks project. SDCWA relined five miles of Pipeline 3 through the unincorporated community of Twin Oaks Valley into the northern part of the City of San Marcos. Pipeline 3 was relined to accommodate pressurized…

Perris Valley Pipeline

Butier Engineering, Inc. provided construction management and inspection services for this $80 million pipeline project, which provides water reliability and quality benefits to western Riverside County. It was a joint effort between Metropolitan Water District of Southern California (lead agency), Western Municipal Water District, and Eastern Municipal Water District. The Perris Valley Pipeline has enhanced…

San Diego Pipeline No. 6—Northern Reach

Butier Engineering, Inc. provided construction management and inspection services for approximately 7 miles of major pipeline construction in Temecula. The San Diego Pipeline No. 6 project consisted of constructing approximately 160 LF of 144-inch diameter fabricated steel pipeline and 35,283 LF of 120-inch diameter fabricated steel pipeline, in-plant fabrication inspection, field welding inspection, constructing facility…

Chino Desalter Phase 3 Product Water Pipeline

Butier Engineering, Inc. provided construction management and inspection services for the Chino Desalter Phase 3 Product Water Pipeline project. The Chino Basin Desalter Authority (CDA) constructed a 30-inch diameter pipeline to deliver drinking water to the cities of Eastvale, Ontario, and Norco. The project began at Mississippi Drive and continued northbound along Hamner Avenue to…